Put infrastructure in place and watch it trigger innovation. Whether it is reliable access to natural gas or reliable access to gas operations data, users rapidly put infrastructure to work for them. In this presentation Southern California Gas Company will ...
Year: 2009
A large electrical power generating plant that produced 30% of the electricity of Las Vegas wanted to improve transformer reliability and increase power output. We designed a PI system that collected data from complex real time hydrogen gas sensors. Within ...
Year: 2009
Presentation covers Reliant generating fleet and OSI PI structure, the Virtual M&D concept, Human Factors, what is a good SmartSignal model, finding model problems, and KPIs and other metrics. This will review results on over 1200 models that have been ...
Year: 2009
Planning power boiler tube inspection, inspection time, method and work scope are important factor to determine effectiveness and reliability of inspection. Time based maintenance (TBM) has been principal of inspection planning for a long time in boiler inspection so that ...
Year: 2009
A detailed description of the design and operation of the PEMEX Gas Emergency Control and Monitoring System will be presented, including an explanation about how PI supports real time information and the benefits of this system. PEMEX Gas is a ...
Year: 2009