• ERCOT’s Use of the OSIsoft Ecosystem for the New Reliability Risk Operator Desk

    With the increasing amount of renewable generation in the ERCOT Interconnection, there is a heightened need to assess and manage more-infrequent yet potentially severe risks. To address these concerns ERCOT has created the Reliability Risk operator desk to, in part, ...
    Year: 2017

    Predictive Analytics at Ciner with the PI System and Falkonry

    Ciners’ Trona Mine and Processing Plant In Green River, Wyoming has a Vertimill that was experiencing unexpected downtime due to lower quality ore grade feed. The Vertimill contributes 65% of the plant's hourly production. Operations asked OSIsoft and Engineering to ...
    Year: 2017

    24K Magic - How Data Was Used to Improve Gold Recovery

    Aurelia Metals Limited (AMI) is Gold and Base Metals mining company located in Orange NSW, Australia. At the end of 2015, Aurelia Metals were grappling with a new plant that was not performing at nameplate capacity, and had a significant debt ...
    Year: 2017

    The Journey from Historian To Business Intelligence

    Scrubgrass Generating produces power in Pennsylvania by burning abandoned coal piles and reclaiming the sites with the ash. When their power purchase agreement ended the plant entered a dynamic pricing merchant operating mode. That mode required the plant know their ...
    Year: 2017

    Managing the Power Grid Using Maps, Real-time Data and Rosetta Stones

    Managing the western half of the North American Power Grid and being responsible for its reliable operation is a challenging mission. Peak receives tens of thousands of measurement and status data points from the Grid every minute. Turning all of ...
    Year: 2017