• Deploying a Condition-Based Maintenance Strategy in the Hydro Power Business

    Vattenfall Hydro Power needed to implement a new strategy for condition-based maintenance and asset management, leading to reduced costs for unplanned maintenance and increased accuracy in asset management risk analysis. The existing IT solution did not provide the necessary functionality ...
    Year: 2015

    CEPS (Czech Transmission System Operator) Challenges and Planned Solutions

    Ensuring reliable transmission of electricity is one of the key challenges at CEPS as a TSO (Transmission System Operator). As part of CEPS’ long-term strategy, PMU technology (Phasor Measurement Unit) was implemented across the most important parts of the extra ...
    Year: 2015

    Insights Using the PI System in Israel Electric's Electricity Chain

    The Israel Electric Corporation (IEC) was established in 1923 and is the sole integrated utility in Israel, being one of the largest industrial companies in the country. IEC generates, transmits and distributes practically all the electricity in Israel, with an ...
    Year: 2015

    Data Visualization for the Liander Grid Control Center

    Liander's strategy in a changing energy playing field is to focus on better customer service, operational excellence and move towards being a data-drive grid operator in the upcoming years. This presentation gives insight in Liander's journey to become a data-driven ...
    Year: 2015

    Increasing Operational Efficiency with the PI System at SRP(1)

    Salt River Project is the oldest multipurpose federal reclamation project in the United States, serving central Arizona since 1903. As one of the nation's largest public power utilities, SRP provides electricity to more than one million retail customers in a ...
    Year: 2015