• A Corporate View of Energy Saving with the PI System

    A division of Cascades, called the Energy Action Group, is tracking all the energy consumption and cost for 160 facilities. A FoxPro database was used to hold the records, but it was taking 15 minutes per facility to produce a ...
    Year: 2004

    Pipelines Monitoring in Pemex

    The purpose of this system is to integrate information from four divisions of Pemex: E&P, Refineries, Gas & Petrochemicals coming from different PI Systems and to show one version of the whole pipeline system in real-time. The system is accessible ...
    Year: 2007

    PI Implementation in a Large Aluminum Smelter Expansion Project

    Located in Sept-Iles (QC) Canada, the Alouette smelter is the largest primary aluminum smelting facility in the Americas and the fifth largest in the world. With an investment of $1.4 billion, its annual production will rise from 245,000 to 550,000 ...
    Year: 2005

    Corporate Implementation of PI in Bulk Manufacturing Sites

    Review of Eli Lilly corporate strategy for implementation of PI. The presentation will also cover how best practices are developed and shared between sites and will include specific examples.
    Year: 2007

    Condition Based Maintenance from PI and SAP

    The presentation will describe how to lower the maintenance and increment the confirmability of the assets through the appliance of CBM and PI SAP tools. ActiveView, RLINK, PI OLEDB, and the PI Server will be discussed and the presenter will ...
    Year: 2007