• Improving Boiler Water Chemistry

    The largest factor for plant down time at AEP's coal fired generating stations are due to boiler tube leaks, and controlling boiler water chemistry can reduce a significant number of tube leaks. Hear how AEP uses the ...
    Year: 2009

    Asset Optimization using PI and AF

    A presentation on how NGT&S is using the PI System to optimize natural gas transmission and storage. NGT&S has been using PI for ten years, and will share in this talk how PI has helped cut their ...
    Year: 2009

    Fleet Optimization Through Process Information(3)

    A well run business needs to accurately know and control its process costs, optimize performance, monitor asset health and enhance market value. This is a challenge for an electric utility. Electric utilities deal with assets and discrete technologies ...
    Year: 2009

    PI System Product Roadmap/Engineering Plan(2)

    An overview of the current PI System Product Roadmap and Engineering Plan.
    Year: 2009

    Seeing Clearly in the New Reality(6)

    This presentation will stress the strategic aspects of the PI System. Key points of this presentation are: Importance of an infrastructure Incorporating real-time, event and historical data in Business Intelligence, Integrating manufacturing and operational data into the business and SAP ...
    Year: 2009