Chelan County PUD installed a PI system to monitor the Rocky Reach and Rock Island Hydroelectric generating plants and the Power Dispatch systems in 2001. In 2002 the IT Monitor product was installed to monitor devices on the control network. PI is used to provide near-real time data to a variety of users throughout the PUD. These users have many different reporting requirements that are detailed in this presentation "Control" at Rock Island.
The job of Cruise Control is to keep the Rock Island headwater as close to our license limit of 613.0 without exceeding it. With a higher headwater we have a higher unit gross head and gain efficiency. We knew that PI would be helpful during the project, but soon realized that it was very helpful.
Company
Chelan County PUD
Speaker
Jeffrey A. Mettler
Jeff received a BSEE degree from Washington State University in 1990, and a Master of Engineering in EE from the University of Idaho in 1996. He also hold a Master of Engineering Management degree from Southern Methodist University and is a registered Professional Engineer in the State of Washington. Jeff worked as an Electrical Engineer for Chelan PUD for 10 years before becoming a Control Systems Analyst (programmer) in 2000. Jeff is also a Cisco Certified Network Associate.