PRESENTATION
2003 - User Conference
PI Tag Tuning at SRS
Brief background of SRS-Evolution of PI at SRS, with initial tag specification details-Using PI data for loop tuning disclosed the need for additional PI tag tuning (Examples showing real data with process fluctuations being missed in PI)-The tuning process, including examples showing results of different compression values with error evaluation-Before and after tuning trends on a number of process variables-Future tuning plans
Company
Westinghouse Savannah River Co.
Speaker
Bernie Sims
Education: BS in Nuclear Engineering, University of Tennessee, 1970 ME in Mechanical Engineering, University of South Carolina, 1976Work History: 34 years at the Savannah River Site, including 20+ working with Nuclear Reactor Process ControlPI Involvement: Spent the last five years building and evolving the PI system used in the High Level Waste Division of SRS