Real-Time Performance Management (RTPM) in a Validated Environment requires an infrastructure designed & implemented to support an overall Validated Solution. In this presentation we will cover the drivers, goals & methods to deliver the RTPM Infrastructure for Mead Johnson Nutritionals. Key technical & management challenges in this implementation include areas such as:
- upgrading & validating existing infrastructures,
- technical design for leverage cross/multi-site,
- design of SLC documentation for application in a multi-site scenario, use of EVT interface 2.0, etc.
The session will close with a look to the future of RTPM at Mead Johnston Nutritionals.