The presentation will address the project goals to improve security, company image, operational excellence, customer satisfaction and, ultimately, have an economic gain. The problem in discussion is that when there is a Load Loss, the first normalization takes a long time, when automation is not available in mid voltage. The occurrence is detected via customers alert and take a long time for the team to reach the point where the problem happened. Their plan is to act on the DEC (equivalent duration of interruption per consuming unit) in the reclosers and main connections output, which is at 14% total now. The way this problem is being treated, nowadays, is by using real-time measurements of current from the PI System. When a variation in the current values occurs, there is a generation of an alert via a routine in Microsoft Excel, the operator analyzes the alert and compares it to the loss variation and with the probable blackout and then he proactively sends an inspection team to the section. The application is very simple and there is very few concrete results, but it has great potential in the energy distribution.