Part A: An overview of a Plant Maintenance Integration Project using RLINK. The implementation of Escondida BHP-Billiton Copper Mine in South America will be used as an example. This presentation will look at the steps required for such an implementation. The technical architecture will be discussed together with the configuration of the system.
Part B: Getting more out of your Integrated Plant Maintenance System. Preparing for Integration. Discussion on Mobile technologies with the PI System and SAP.