This presentation discusses how CEMIG Generation and Transmission tested, acquired and implemented the PI System in their hyrology and telemetry systems. The subsequent expansion into the areas of predictive monitoring of existing generatio and transmission and other future possible expansions in the Operation Center are also discussed.